On August 2019, the LEDLUCKY indoor lighting project team participated in the lighting project of Pingshan Experimental Primary School in Shenzhen: 40 student classrooms, 20 teacher offices and 1 library, with a total of 540 sets of lamps. Because it comes to term begin, the project cycle is relatively urgent, and only one month left for us.
According to the different scenarios,we have selected different products corresponding to the this.
1.Teacher’s office lighting: requirements: suspended installation, the average illuminance of each desk is 300lx, the color temperature is 4000K, the light is evenly distributed, soft lighting, and it is not dazzling when viewed directly.
We are equipped with 25W backlit panel light, 140lm/W, 1200*300mm, UGR<19,110deg, Lifud Driver, and adopt the suspended installation method, each lamp corresponds to a desk
2.Student classroom lighting: requirement: suspended installation, the average illuminance is 500lx, color temperature is 4000K, the light is evenly distributed,soft lighting, and it is dazzling when viewed directly.
We are equipped with 25W, high efficiency 180lm/W Backlit panel light, 1200*300mm, UGR<19,110deg,Lifud Driver. Adopt the suspended installation method,the light is evenly distributed in every corner, power density <9w/㎡
3.Library lighting: requirement: suspended installation, the average illuminance of each desk is 300lux,the color temp is 4000K, the light is evenly distributed, soft lighting, and it is not dazzling when viewed directly.
We are equipped with 25W Backlit Premium panel light,140lm/W,1200*300mm,UGR<19,110deg,Lifud Driver. Adopt the suspended installation method,the light is evenly distributed in every corner, no glare, average illuminance 300lx.
LEDlucky has rich project experience, complete products and certifications, which greatly shortened the project cycle, but the time is still tight. Fortunately, LEDlucky has strong production capacity, so that we completed the mass production within 15 days, in cooperation with the project construction and installation, the installation and acceptance were completed 5 days ahead of schedule, making contributions to children’s education.